Wonderful opportunity for Commercial/Industrial development such as manufacturing or warehousing. A part of the APPROVED Duke Energy Site Readiness Program. Engineering reports on aerial maps, utilities, topography, hydrology, soils, zoning, and transportation, buildable area, slope analysis and permitting information. The site is served by municipal water, sewer, and natural gas and has CSX RAILROAD FRONTAGE. This is the ONLY DUKE served industrial site in Edgecombe County . 230kV transmission
100368621
Land, Business Opportunities, Other
Edgecombe
76.59
Acres
Public
Public Sewer
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...